Site Selection

New England Energy Zone

The Walcha area was selected because it is one of the best wind resource areas in NSW, and is within the proposed New England Energy Zone which was identified as one of three potential priority energy zones in the state in the NSW Government Submission on AEMO’s Integrated System Plan (March 2018).

The proposed project site is in relatively close proximity to the existing transmission network operated by TransGrid. The Winterbourne Wind Farm project will include approximately 30km of new 330kV transmission line which will tie into the existing TransGrid network via a new 330kV switchyard which is proposed to be constructed approximately 7km south of Uralla, NSW.

Loader Loading...
EAD Logo Taking too long?

Reload Reload document
| Open Open in new tab

Great Location

Wind resource monitoring conducted at the site since 2009 indicates that wind speeds are high and consistent, making the wind farm project viable in this location.

The proposed project area has many low peaks and ridgelines which provide suitable locations for the construction of wind turbines.  There are good existing access roads to and within the site, allowing for transport of turbine blades, towers, and electrical equipment and movement of construction vehicles within the project area.  However, some existing roads and infrastructure may need to be upgraded, and several new access roads will be constructed within the site as part of the proposed project.

Though the population density is relatively low, there are several existing residences within the project area, and the proposed wind farm will be designed to minimize potential visual and noise impacts to landowners and tenants in the area.  Much of the project area is currently used for livestock grazing and has been cleared of trees and other vegetation, meaning the potential for impacts to flora and fauna is greatly reduced.

Site Selection

Supportive Community

Importantly, the project landowners and local Council have been supportive of the proposed project, and will benefit from implementation of the project through an innovative ownership model and revenue sharing arrangement.  WinterbourneWind will continue to engage with the local community and relevant local, state and federal stakeholders during project development to ensure the proposed project addresses community concerns and meets with community expectations.

supportive community member